Pictures from Mar 14th 2006

In the past month we completed the frame and floors, placed the engine, installed the dripless seal, installed splines at the garboard plank, and initiated the plank removal necessary to sister frames near the fore mast step.

Engine Bed and floors raw wood Engine mockup fit Floors and Beds painted and walk around support New Engine Engine seated New water filter Installed 

 Dripless shaft seal installed  Port Spline area  Starboard Spline area  Rudder and deadwood cleanup  Deadwood pinked out  Rudder filled out

 Prep for destruction bad butt block area  One foot of plank, first piece removed  Partial plank removed foreward of butt block

 Return to Home Page