DirigoSailing

Main mast final lifted

After reposition and rollover, we are going for the insertion lift. Note the top mast is loaded but not extended. It was felt that the extended position would change the balance point, and that the crane would not be able to lift the assembly high enough from the higher balance point.

Return to April 27th 1998 Pictures Page