Pictures from Apr 9th 2006

We have now completed plank demolition, fitted sisters, built sole inspection areas so that the area being repaired can have sisters installed and can be monitored, rebuilt the engine bulkhead mating area, fitted the water lift muffler.

Starboard demolition complete Port demolition complete Main Salon Starboard inspection area Starboard amidships cabin inspection area New Water lift muffler fitted Main Salon inspection plate sole fitted 

 New sole fore of new engine  Engine bulkhead with maintenance door, storage  Meanwhile, the iron from butterfly hatch combing area

 Return to Home Page